Phase 1: Initialization and Self-Bootstrapping
Duration: Weeks 1-4 | BMAD Focus: Foundation Establishment
Overview
Phase 1 establishes the core Metacogna Subculture Management (MSM) system by bootstrapping from existing documentation and establishing fundamental alignment between Engineer and Business subcultures. This phase creates the initial reflection loop that will drive all subsequent development.
Objectives
- Self-Bootstrapping: Extract development tasks directly from existing system documentation
- Profile Alignment: Establish initial alignment between Engineer and Business subculture perspectives
- Foundation Data: Generate first versions of TaskModel and GoalModel data structures
- Trust Baseline: Establish initial trust and collaboration metrics
BMAD Implementation
Build Phase
- Documentation Parsing: Load and segment initial system documentation into task candidates
- Confidence Scoring: Assign confidence scores to extracted tasks using language models
- Data Structure Creation: Initialize core data models (TaskModel, GoalModel, ProfileModel)
Measure Phase
- Alignment Analysis: Calculate alignment between extracted tasks and defined strategic goals
- Trust Assessment: Record initial trust and collaboration baselines between subcultures
- Quality Metrics: Establish baseline metrics for task confidence and goal alignment
Align Phase
- HITL Feedback: Apply human-in-the-loop feedback to refine low-confidence tasks
- Profile Balancing: Balance task distribution between Engineer and Business subcultures
- Cultural Calibration: Adjust initial subculture profiles based on collaboration patterns
Develop Phase
- Validated Goals: Finalize initial set of validated goals and tasks
- Foundation Storage: Store mission-level alignment report as foundation for future cycles
- Process Documentation: Document initial processes and establish templates
Key Deliverables
Data Structures
TaskModelinstances with confidence scoresGoalModelhierarchy (Mission → Strategic → Operational → Tactical)ProfileModeldefinitions for Engineer and Business subcultures
Documentation
- Mission-level alignment report
- Initial process documentation
- Subculture profile definitions
Infrastructure
- Core reflection loop implementation
- Basic alignment measurement tools
- Initial feedback collection mechanisms
Success Metrics
- Trust Uplift: +15% improvement in inter-subculture trust metrics
- Cycle Efficiency: +10% improvement in development cycle efficiency
- Alignment Score: Achieve 0.7 threshold for task-goal alignment
Risk Mitigation
- Over-Engineering Prevention: Focus on minimal viable alignment rather than comprehensive solutions
- Feedback Loop Establishment: Ensure human feedback mechanisms are functional from day one
- Incremental Validation: Validate each component before moving to the next
Transition to Phase 2
Phase 1 completion is marked by:
- Stable core data structures
- Established feedback loops
- Baseline trust and alignment metrics
- Documented processes for continued development
The foundation established in Phase 1 enables the utility expansion and deeper subcultural testing of Phase 2.