Skip to main content

Phase 2: Core Utility Expansion and Subcultural Testing

Duration: Weeks 5-8 | BMAD Focus: Utility Development and Validation

Overview

Phase 2 expands the MSM system's core utilities while validating the two-profile SIA (Symmetrical Intelligence Augmentation) loop through iterative feedback-driven development. This phase focuses on deepening the reflection and symbiosis hooks while testing fairness and collaboration balance between subcultures.

Objectives

  • Reflection Enhancement: Introduce reflection and symbiosis hooks for self-evaluation
  • Fairness Validation: Test collaboration balance between Engineer and Business subcultures
  • Confidence Refinement: Improve confidence scoring and alignment analyzer performance
  • Feedback Integration: Establish robust feedback loops for continuous improvement

BMAD Implementation

Build Phase

  • Task Generation: Generate new tasks based on prior alignment reports and feedback
  • Model Enhancement: Enhance TaskModel, ProfileModel, and scoring mechanisms
  • Utility Development: Build core utilities for reflection, symbiosis, and fairness monitoring
  • Feedback Infrastructure: Implement feedback collection and processing systems

Measure Phase

  • Collaboration Metrics: Track mutual feedback frequency, task success rate, and interaction quality
  • Fairness Analysis: Compute fairness metrics using Gini coefficient and other equity measures
  • Performance Tracking: Monitor system performance across different subculture interactions
  • Quality Assessment: Evaluate the accuracy and reliability of confidence scoring

Align Phase

  • Goal Weight Adjustment: Adjust goal weights to reduce inequity and role imbalance
  • Profile Evolution: Update subcultural profiles based on emerging behavioral norms
  • Feedback Integration: Incorporate user feedback into system adjustments
  • Balance Optimization: Optimize resource and task distribution for maximum fairness

Develop Phase

  • Schema Updates: Release updated TaskModel and ProfileModel schemas
  • Performance Integration: Integrate performance data into next planning cycle
  • Process Refinement: Document improved processes and establish new templates
  • Validation Framework: Create comprehensive testing framework for subcultural interactions

Key Deliverables

Enhanced Utilities

  • Reflection Hooks: Automated self-assessment mechanisms
  • Symbiosis Hooks: Cross-subculture collaboration facilitators
  • Fairness Monitors: Real-time equity measurement tools
  • Feedback Processors: Automated feedback analysis and integration

Data Structures

  • Enhanced TaskModel: Improved confidence scoring and metadata
  • ProfileModel v2.0: Dynamic profile evolution capabilities
  • FeedbackModel: Structured feedback collection and analysis
  • MetricsModel: Comprehensive performance tracking

Documentation

  • Utility Documentation: Complete guides for all new utilities
  • Process Documentation: Updated workflows incorporating new capabilities
  • Testing Framework: Comprehensive validation procedures

Success Metrics

  • Collaboration Uplift: +20% improvement in cross-subculture collaboration
  • Misalignment Reduction: -18% reduction in subcultural conflicts
  • Fairness Index: Achieve target fairness index of 0.2 (Gini coefficient)

Risk Mitigation

  • Feedback Overload: Implement feedback prioritization and filtering
  • Cultural Bias: Regular fairness audits and bias detection
  • System Complexity: Maintain modular architecture for manageability
  • Performance Impact: Monitor and optimize feedback processing overhead

Transition to Phase 3

Phase 2 completion is marked by:

  • Stable utility ecosystem
  • Validated SIA feedback loops
  • Balanced subcultural interactions
  • Comprehensive testing framework

The validated utilities and feedback mechanisms established in Phase 2 provide the foundation for the mathematical and game-theoretic enhancements of Phase 3.